8. Assembly details of the superstructure as shown below. Although not shown on this picture, the small guns inside the superstructure should be installed already. |
|||||
![]() |
|||||
Not shown in this drawing are funnel gratings 24d and 25d. Form them and glue into funnel rings 24c and 24d respectively. Assemble and place ship boats on stands 57 in the following order: motor boat 59 on the left side close to the funnel, large boat 59 on the right side, and one each of boats 58 on the outboard stands. |
|||||
![]() |
|||||
9. Navigation bridge structure. |
|||||